Valid HTML 4.01!
PCTA Trail Project: Ebbetts Pass South to Noble Lake,
Toiyabe NF, Carson RD, Map J4. 15 - 17 August 2003
Digital File and Log dif_log030902.html

Purpose: removal of downed trees, brushing, tread repair. An enjoyable time with great weather for our crew of six. We cleared five blow-downs (thanks to Pete Fish), plus numerous leaners. Our lopping and pruning crew (Pat, Tim and Kathleen) brushed and cleared four miles of trail, restoring the equestrian corridor. The heavy construction crew (Warren, John and Bill) restored three sections of tread (two sections had completely sloughed off) on the volcanic rock slope north of Noble Lake. We all had lots of tread clean up, boulder moving and rock crushing to produce gravel for the water crossings. Image numbers vary but are in correct viewing order.

Note: For best viewing, click on thumbnail, open in a new window.

TN030902_01.jpg
030902_01.jpg
TN030902_02.jpg
030902_02.jpg
TN030902_09.jpg
030902_09.jpg
TN030902_03.jpg
030902_03.jpg
TN030902_04.jpg
030902_04.jpg
Img 01 Tread sloughed away. Img 02 Tread restored by Warren, Bill, and John. Img 09 Hiker testing tread. Img 03 Tread eroded. Img 04 Tread erosion repaired by John and Bill.
TN030902_06.jpg
030902_06.jpg
TN030902_10.jpg
030902_10.jpg
TN030902_08.jpg
030902_08.jpg
TN030902_07.jpg
030902_07.jpg
TN030902_12.jpg
030902_12.jpg
Img 06 42" dia. tree in trail. Img 10 John restoring tread after Pete cut tree. Img 08 Same tree from other side. Img 07 Trail ready. Img 12 Trail too narrow for pack animals.
TN030902_11.jpg
030902_11.jpg
TN030902_13.jpg
030902_13.jpg
TN030902_17.jpg
030902_17.jpg
TN030902_14.jpg
030902_14.jpg
TN030902_16.jpg
030902_16.jpg
Img 11 Trail widened by Tim, John and Bill. Img 13 Lunch break. Img 17 A tree to be cross cut. Img 14 Tree removed with cross cut saw by Warren and Bill. Img 16 Happy hour, Tim, Kathleen, Pat, and Warren.
TN030902_15.jpg
030902_15.jpg
       
Img 15 After Dinner, Jon, Warren, Kathleen and Pat.

©2003 Mountain High West, campy@trailprojects.com